ITAC Assessment: WV0455
ITAC logo
ITAC Assessment: WV0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product fabricated rubber
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 102,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,997 2,197,320
kWh
Electricity Demand $43,240 7,356
kW-mo/yr
Electricity Fees $70 -
Natural Gas $65,257 7,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,386

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $15,670 $16,140 $14,223
179,609
kWh
$1,447
-
kW-mo/yr
- -
02 2.7231: Use radiant heater for spot heating $6,540 $12,520 - - $6,540
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,439 $5,745 $5,528
69,804
kWh
$911
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $6,023 $2,440 $5,025
63,454
kWh
$829
-
kW-mo/yr
$169
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $3,160 $5,680 $2,037
25,718
kWh
$1,123
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,600 $3,294 $2,230
28,163
kWh
$370
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $2,374 $4,330 - - $2,374
-
MMBtu
-
08 2.1221: Replace obsolete burners with more efficient ones $1,918 $4,850 - - $1,918
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,863 $1,706 $1,598
20,182
kWh
$265
-
kW-mo/yr
- -
10 2.4239: Eliminate or reduce compressed air usage $1,663 $2,117 $1,428
18,030
kWh
$235
-
kW-mo/yr
- -
11 2.4157: Establish a predictive maintenance program $1,644 $1,000 $2,658
33,569
kWh
$441
-
kW-mo/yr
- $(-1,455.0)
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,418 $1,000 $1,217
15,367
kWh
$201
-
kW-mo/yr
- -
13 2.4151: Develop a repair/replace policy $1,157 $841 $1,715
21,658
kWh
$282
-
kW-mo/yr
- $(-840.0)
14 2.2414: Use waste heat from hot flue gases to preheat $1,149 $4,320 - - $1,149
-
MMBtu
-
15 2.4231: Reduce the pressure of compressed air to the minimum required $845 $70 $757
9,558
kWh
$88
-
kW-mo/yr
- -
16 2.7142: Utilize higher efficiency lamps and/or ballasts $712 $620 $612
7,722
kWh
$100
-
kW-mo/yr
- -
17 2.7134: Use photocell controls $645 $620 $412
5,204
kWh
$233
-
kW-mo/yr
- -
18 2.1233: Analyze flue gas for proper air/fuel ratio $377 $500 - - $482
-
MMBtu
$(-105.0)
TOTAL RECOMMENDED $56,197 $67,793 $39,440
498,038
kWh
$6,525
-
kW-mo/yr
$12,632
-
MMBtu
$(-2,400.0)
TOTAL IMPLEMENTED $25,386 $19,953 $23,180
292,711
kWh
$3,955
-
kW-mo/yr
$651
-
MMBtu
$(-2,400.0)