Assessment Year | 2012 |
---|---|
Principal Product | Treated Railroad Ties |
NAICS | 321114: Wood Preservation |
SIC | 2491: Wood Preserving |
Sales Range | $10 M to 50M |
# of Employees | 63 |
Plant Area |
10,000
ft2
|
Annual Production | 3,415,565
units
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,621 | 3,143,398 |
kWh
|
$0.039 |
Electricity Demand | $122,503 | 8,281 |
kW-mo/yr
|
$14.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,227 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,498 | $8,040 | - |
$8,498
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,137 | $15,286 |
$2,043
52,795
kWh
|
$1,094
-
kW-mo/yr
|
- | |
03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,848 | $1,560 |
$1,236
31,956
kWh
|
$1,612
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,825 | $4,714 |
$1,784
46,121
kWh
|
$1,041
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,676 | $10,532 |
$1,744
45,088
kWh
|
$932
-
kW-mo/yr
|
- | |
06 | 2.4157: Establish a predictive maintenance program | $1,945 | $1,000 |
$2,535
65,525
kWh
|
$1,361
-
kW-mo/yr
|
$(-1,951.0) | |
07 | 2.4312: Improve lubrication practices | $1,688 | $500 |
$1,096
28,323
kWh
|
$592
-
kW-mo/yr
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,593 | $1,555 |
$942
24,351
kWh
|
$651
-
kW-mo/yr
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,548 | - |
$1,008
26,049
kWh
|
$540
-
kW-mo/yr
|
- | |
10 | 2.4151: Develop a repair/replace policy | $1,353 | $838 |
$1,892
48,899
kWh
|
$1,021
-
kW-mo/yr
|
$(-1,560.0) | |
11 | 2.2437: Recover waste heat from equipment | $247 | $290 |
$203
5,248
kWh
|
$44
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $28,358 | $44,315 |
$14,483
374,355
kWh
|
$17,386
-
kW-mo/yr
|
$(-3,511.0) | ||
TOTAL IMPLEMENTED | $13,227 | $31,870 |
$9,567
247,275
kWh
|
$5,220
-
kW-mo/yr
|
$(-1,560.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs