ITAC Assessment: WV0443
ITAC logo
ITAC Assessment: WV0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automobile Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 565
Plant Area 425,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,064
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,996,901 31,608,216
kWh
Electricity Demand $504,774 63,092
kW-mo/yr
Natural Gas $878,400 148,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $450,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $186,348 $102,956 $156,596
2,478,569
kWh
$29,752
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $59,316 $160,057 $49,908
789,937
kWh
$9,408
-
kW-mo/yr
- -
03 2.4157: Establish a predictive maintenance program $39,551 $6,000 $33,979
537,814
kWh
$6,400
-
kW-mo/yr
- $(-828.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,777 $32,050 $30,777
487,138
kWh
- - -
05 2.4151: Develop a repair/replace policy $25,750 $5,551 $23,434
370,906
kWh
$4,416
-
kW-mo/yr
- $(-2,100.0)
06 2.2426: Use waste heat from flue gases to heat space conditioning air $22,024 $43,600 - - $22,024
-
MMBtu
-
07 2.4224: Upgrade controls on compressors $16,138 $34,000 $8,298
131,344
kWh
$7,840
-
kW-mo/yr
- -
08 2.2414: Use waste heat from hot flue gases to preheat $13,230 $31,450 - - $13,230
-
MMBtu
-
09 2.2414: Use waste heat from hot flue gases to preheat $9,998 $40,725 - - $9,998
-
MMBtu
-
10 2.4221: Install compressor air intakes in coolest locations $9,620 $2,000 $8,092
128,078
kWh
$1,528
-
kW-mo/yr
- -
11 2.7241: Install outside air damper / economizer on hvac unit $6,831 $10,700 $6,831
108,117
kWh
- - -
12 2.4231: Reduce the pressure of compressed air to the minimum required $6,825 $5,175 $5,745
90,933
kWh
$1,080
-
kW-mo/yr
- -
13 2.2113: Repair or replace steam traps $5,366 $6,738 - - $6,766
-
MMBtu
$(-1,400.0)
14 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,361 $998 $4,511
71,407
kWh
$850
-
kW-mo/yr
- -
15 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,236 $1,000 $4,406
69,734
kWh
$830
-
kW-mo/yr
- -
16 2.7231: Use radiant heater for spot heating $2,093 $6,840 - - $2,093
-
MMBtu
-
17 2.4312: Improve lubrication practices $2,091 $1,255 $1,707
27,019
kWh
$384
-
kW-mo/yr
- -
18 2.2511: Insulate bare equipment $1,749 $4,020 $430
6,803
kWh
$80
-
kW-mo/yr
$1,239
-
MMBtu
-
19 2.1233: Analyze flue gas for proper air/fuel ratio $1,224 $2,500 - - $1,382
-
MMBtu
$(-158.0)
20 2.4239: Eliminate or reduce compressed air usage $744 $1,058 $744
11,768
kWh
- - -
TOTAL RECOMMENDED $450,272 $498,673 $335,458
5,309,567
kWh
$62,568
-
kW-mo/yr
$56,732
-
MMBtu
$(-4,486.0)
TOTAL IMPLEMENTED $151,122 $193,097 $123,157
1,949,302
kWh
$23,064
-
kW-mo/yr
$9,387
-
MMBtu
$(-4,486.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings