ITAC Assessment: WV0442
ITAC logo
ITAC Assessment: WV0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Welded Steel Pipes
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 136
Plant Area 175,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 8,008
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,100 2,404,449
kWh
Electricity Demand $108,591 7,589
kW-mo/yr
Electricity Fees $7,121 -
Natural Gas $86,576 11,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.7231: Use radiant heater for spot heating $12,851 $21,250 - - - $12,851
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $9,605 $46,000 $6,185
159,725
kWh
$3,420
-
kW-mo/yr
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,204 $8,000 - $9,204
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,540 $24,996 $4,850
125,252
kWh
$2,690
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,141 $834 $2,667
68,880
kWh
$1,474
-
kW-mo/yr
- - -
06 2.1133: Adjust burners for efficient operation $3,725 $10,260 - - - $3,725
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,772 $8,303 $2,028
52,377
kWh
$744
-
kW-mo/yr
- - -
08 2.4157: Establish a predictive maintenance program $1,662 $4,000 $1,196
30,900
kWh
$658
-
kW-mo/yr
- - $(-192.0)
09 2.4221: Install compressor air intakes in coolest locations $1,406 $1,900 $905
23,370
kWh
$501
-
kW-mo/yr
- - -
10 2.3212: Optimize plant power factor $1,268 $6,650 - - $1,268 - -
11 2.4151: Develop a repair/replace policy $1,051 $644 $1,064
27,467
kWh
$587
-
kW-mo/yr
- - $(-600.0)
12 2.4231: Reduce the pressure of compressed air to the minimum required $960 $1,050 $617
15,942
kWh
$343
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $56,185 $133,887 $19,512
503,913
kWh
$19,621
-
kW-mo/yr
$1,268 $16,576
-
MMBtu
$(-792.0)
TOTAL IMPLEMENTED $19,079 $41,784 $10,394
268,441
kWh
$5,752
-
kW-mo/yr
- $3,725
-
MMBtu
$(-792.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs