| Assessment Year | 1996 |
|---|---|
| Principal Product | Laminated wall paneling |
| NAICS |
n/a
|
| SIC | 2435: Hardwood Veneer and Plywood |
| Sales Range | $100 M to 500M |
| # of Employees | 140 |
| Plant Area |
428,600
ft2
|
| Annual Production | 15,000,000
thousand feet
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $334,073 | 4,542,204 |
kWh
|
$0.074 |
| Electricity Demand | $7,439 | 2,094 |
kW-mo/yr
|
$3.55 |
| Electricity Fees | $104,977 | - |
|
- |
| Natural Gas | $175,674 | 57,306 |
MMBtu
|
$3.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,253 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,755 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,072 | $2,400 |
$6,072
75,615
kWh
|
- | - | |
| 02 | 2.2612: Use cooling tower water instead of refrigeration | $1,584 | $3,850 |
$1,584
31,653
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,718 | $2,400 |
$3,718
148,593
kWh
|
- | - | |
| 04 | 2.7261: Install timers and/or thermostats | $2,171 | $780 |
$994
31,653
kWh
|
$1,177
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,512 | $8,748 |
$3,512
70,340
kWh
|
- | - | |
| 06 | 3.6192: Use a less expensive method of waste removal | $25,196 | - | - | - |
$25,196
-
lb
|
|
| TOTAL RECOMMENDED | $42,253 | $18,178 |
$15,880
357,854
kWh
|
$1,177
-
MMBtu
|
$25,196
-
lb
|
||
| TOTAL IMPLEMENTED | $11,755 | $11,928 |
$10,578
177,608
kWh
|
$1,177
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs