Assessment Year | 2012 |
---|---|
Principal Product | Plastic injection molded containers |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
102,500
ft2
|
Annual Production | 14,400,000
lb
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $490,682 | 8,888,163 |
kWh
|
$0.055 |
Electricity Demand | $259,185 | 21,758 |
kW-mo/yr
|
$11.91 |
Electricity Fees | $1,200 | - |
|
- |
Natural Gas | $100,324 | 10,652 |
MMBtu
|
$9.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,887 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,038 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $23,150 | $21,800 |
$13,074
236,801
kWh
|
$10,076
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,360 | $36,050 |
$17,499
316,961
kWh
|
$7,861
-
kW-mo/yr
|
- | - | |
03 | 2.4156: Establish a preventative maintenance program | $10,500 | $2,000 |
$7,541
136,594
kWh
|
$3,389
-
kW-mo/yr
|
- | $(-430.0) | |
04 | 2.1116: Improve combustion control capability | $9,797 | $44,000 | - | - |
$9,797
-
MMBtu
|
- | |
05 | 2.4151: Develop a repair/replace policy | $8,028 | $823 |
$6,033
109,275
kWh
|
$2,715
-
kW-mo/yr
|
- | $(-720.0) | |
06 | 2.4312: Improve lubrication practices | $4,733 | $3,930 |
$3,268
59,186
kWh
|
$1,465
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $4,089 | $1,440 |
$4,089
74,071
kWh
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,442 | $3,000 |
$2,370
42,924
kWh
|
$1,072
-
kW-mo/yr
|
- | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $2,501 | $563 |
$1,727
31,282
kWh
|
$774
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,414 | $2,980 |
$1,176
21,307
kWh
|
$238
-
kW-mo/yr
|
- | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $952 | $1,700 |
$654
11,852
kWh
|
$298
-
kW-mo/yr
|
- | - | |
12 | 2.2511: Insulate bare equipment | $688 | $599 |
$474
8,586
kWh
|
$214
-
kW-mo/yr
|
- | - | |
13 | 2.4231: Reduce the pressure of compressed air to the minimum required | $233 | $60 |
$162
2,938
kWh
|
$71
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $94,887 | $118,945 |
$58,067
1,051,777
kWh
|
$28,173
-
kW-mo/yr
|
$9,797
-
MMBtu
|
$(-1,150.0) | ||
TOTAL IMPLEMENTED | $29,038 | $13,392 |
$21,024
380,810
kWh
|
$9,164
-
kW-mo/yr
|
- | $(-1,150.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs