ITAC Assessment: WV0090
ITAC logo
ITAC Assessment: WV0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic and Metal Containers
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 300,000
ft2
Annual Production 7,128,000
pieces
Production Hrs. Annual 5,304
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,049 3,586,167
kWh
Electricity Demand $89,020 10,414
kW-mo/yr
Electricity Fees $10,481 -
Natural Gas $88,713 17,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,613 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $319 $289 $72
1,758
kWh
$247
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,072 $5,370 $229
7,620
kWh
$843
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $658 $1,313 $658
21,688
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $2,608 $680 $2,608
86,460
kWh
- - -
05 2.4314: Use synthetic lubricant $599 $650 $599
19,930
kWh
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $965 $3,500 - - $965
-
MMBtu
-
07 2.2136: Install / repair insulation on steam lines $11,509 $1,154 - - $11,509
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $333 $215 - - $333
-
MMBtu
-
09 3.5315: Lease / purchase baler; sell cardboard to recycler $2,550 $225 - - - $2,550
TOTAL RECOMMENDED $20,613 $13,396 $4,166
137,456
kWh
$1,090
-
kW-mo/yr
$12,807
-
MMBtu
$2,550
TOTAL IMPLEMENTED $14,490 $8,991 $1,558
50,996
kWh
$1,090
-
kW-mo/yr
$11,842
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs