Assessment Year | 2011 |
---|---|
Principal Product | Storm Doors |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $5 M to 10M |
# of Employees | 200 |
Plant Area |
350,000
ft2
|
Annual Production | 750,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Virginia |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,367 | 3,359,044 |
kWh
|
$0.060 |
Electricity Demand | $77,296 | 9,674 |
kW-mo/yr
|
$7.99 |
Other Gas | $29,584 | 1,652 |
MMBtu
|
$17.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,740 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,182 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,791 | $69,419 |
$26,443
438,885
kWh
|
$9,348
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,832 | $363 |
$5,787
96,044
kWh
|
$2,045
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,170 | $5,180 |
$3,107
51,575
kWh
|
$1,063
-
kW-mo/yr
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $3,937 | $18,000 |
$3,304
54,845
kWh
|
$633
-
kW-mo/yr
|
- | - | |
05 | 2.4151: Develop a repair/replace policy | $2,985 | $613 |
$2,522
41,856
kWh
|
$895
-
kW-mo/yr
|
- | $(-432.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,934 | $5,194 |
$1,942
32,230
kWh
|
$992
-
kW-mo/yr
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $2,803 | $1,613 |
$2,068
34,324
kWh
|
$735
-
kW-mo/yr
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,837 | $1,119 |
$1,358
22,535
kWh
|
$479
-
kW-mo/yr
|
- | - | |
09 | 2.7492: Use proper thickness of insulation on building envelope | $1,451 | $4,200 | - | - |
$1,451
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $63,740 | $105,701 |
$46,531
772,294
kWh
|
$16,190
-
kW-mo/yr
|
$1,451
-
MMBtu
|
$(-432.0) | ||
TOTAL IMPLEMENTED | $54,182 | $78,321 |
$40,120
665,874
kWh
|
$14,494
-
kW-mo/yr
|
- | $(-432.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs