ITAC Assessment: WV0436
ITAC logo
ITAC Assessment: WV0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Precious metals
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 168,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,286 7,476,000
kWh
Electricity Demand $117,468 15,048
kW-mo/yr
Natural Gas $297,304 38,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2442: Preheat combustion air with waste heat $62,911 $74,268 - - - $62,911
-
MMBtu
-
02 2.3212: Optimize plant power factor $32,243 $22,700 - - $32,243 - -
03 2.2443: Re-use or recycle hot or cold process exhaust air $21,604 $29,900 $(-1,749.0)
(-28,590)
kWh
$(-304.0)
-
kW-mo/yr
- $25,657
-
MMBtu
$(-2,000.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,837 $45,545 $12,630
206,473
kWh
$2,207
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,983 $8,375 $9,353
152,903
kWh
$1,630
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $9,039 $1,920 $7,697
125,837
kWh
$1,342
-
kW-mo/yr
- - -
07 2.2692: Use outside cold water source as a supply of cooling water $7,082 $25,000 $6,029
98,561
kWh
$1,053
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $6,227 $12,576 $5,299
86,627
kWh
$928
-
kW-mo/yr
- - -
09 2.7261: Install timers and/or thermostats $4,976 $5,400 - - - $4,976
-
MMBtu
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $1,400 $1,000 - - - $1,440
-
MMBtu
$(-40.0)
11 2.2511: Insulate bare equipment $335 $154 - - - $335
-
MMBtu
-
TOTAL RECOMMENDED $171,637 $226,838 $39,259
641,811
kWh
$6,856
-
kW-mo/yr
$32,243 $95,319
-
MMBtu
$(-2,040.0)
TOTAL IMPLEMENTED $22,799 $59,275 $17,929
293,100
kWh
$3,135
-
kW-mo/yr
- $1,775
-
MMBtu
$(-40.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs