| Assessment Year | 2003 |
|---|---|
| Principal Product | fabrication of dies, jigs, and tools |
| NAICS | 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
42,500
ft2
|
| Annual Production | 1,162
pieces
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $144,796 | 1,191,900 |
kWh
|
$0.12 |
| Electricity Demand | $34,639 | 7,848 |
kW-mo/yr
|
$4.41 |
| Electricity Fees | $4,973 | - |
|
- |
| Natural Gas | $1,307 | 164 |
MMBtu
|
$7.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $590,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $584 | $767 |
$482
4,033
kWh
|
$102
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,644 | $500 |
$8,046
67,260
kWh
|
$1,286
-
kW-mo/yr
|
$(-688.0) | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,526 | - |
$2,239
18,031
kWh
|
$287
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,935 | $2,250 |
$2,530
21,150
kWh
|
$405
-
kW-mo/yr
|
- | - | |
| 05 | 2.6218: Turn off equipment when not in use | $14,728 | $1,000 |
$14,728
113,400
kWh
|
- | - | - | |
| 06 | 4.431: Train operators for maximum operating efficiency | $198,375 | $32,670 | - | - | $198,375 | - | |
| 07 | 4.731: Advertise product or service | $242,800 | $2,000 | - | - | - | $242,800 | |
| 08 | 4.625: Develop standard operating procedures | $120,000 | $7,997 | - | - | - | $120,000 | |
| TOTAL RECOMMENDED | $590,592 | $47,184 |
$28,025
223,874
kWh
|
$2,080
-
kW-mo/yr
|
$197,687 | $362,800 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs