ITAC Assessment: WV0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Plastic injection molded products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 21
Plant Area 122,000
ft2
Annual Production 300,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,530 1,159,200
kWh
Electricity Demand $50,246 6,442
kW-mo/yr
Natural Gas $33,283 4,106
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,580 $26,175 $6,462
107,740
kWh
$4,118
-
kW-mo/yr
- - -
02 2.7224: Reduce space conditioning during non-working hours $7,088 $2,144 - - - $7,088
-
MMBtu
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,062 $10,480 - $7,062
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,758 $272 $2,175
36,257
kWh
$1,583
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $2,651 $5,480 - - $2,651 - -
06 2.4151: Develop a repair/replace policy $1,546 $668 $1,096
18,279
kWh
$834
-
kW-mo/yr
- - $(-384.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,437 $4,415 $875
14,596
kWh
$562
-
kW-mo/yr
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,264 $3,284 $718
11,974
kWh
$546
-
kW-mo/yr
- - -
09 2.4157: Establish a predictive maintenance program $1,230 $1,000 $822
13,709
kWh
$632
-
kW-mo/yr
- - $(-224.0)
10 2.4221: Install compressor air intakes in coolest locations $737 $878 $425
7,078
kWh
$312
-
kW-mo/yr
- - -
11 2.4314: Use synthetic lubricant $608 $516 $351
5,845
kWh
$257
-
kW-mo/yr
- - -
12 2.4235: Remove or close off unneeded compressed air lines $330 $66 $330
5,502
kWh
- - - -
13 2.4231: Reduce the pressure of compressed air to the minimum required $190 $16 $112
1,870
kWh
$78
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $38,481 $55,394 $13,366
222,850
kWh
$15,984
-
kW-mo/yr
$2,651 $7,088
-
MMBtu
$(-608.0)
TOTAL IMPLEMENTED $16,187 $9,097 $5,761
96,058
kWh
$3,946
-
kW-mo/yr
- $7,088
-
MMBtu
$(-608.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs