ITAC Assessment: OK0606
ITAC logo
ITAC Assessment: OK0606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product metal components/ custom metal components
NAICS
n/a
SIC 3324: Steel Investment Foundries
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 30,000
ft2
Annual Production 3,500,000
units
Production Hrs. Annual 5,840
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,941 1,904,400
kWh
Electricity Demand $46,229 -
Electricity Fees $300 -
Natural Gas $36,762 7,997
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $59,500 $115,187 - $59,500
02 2.7229: Air condition only space necessary $291 $112 $291
8,400
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $67 $66 $67
1,926
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $596 $300 $596
17,236
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,049 - $1,049
30,328
kWh
-
TOTAL RECOMMENDED $61,503 $115,665 $2,003
57,890
kWh
$59,500
TOTAL IMPLEMENTED $2,003 $478 $2,003
57,890
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs