ITAC Assessment: TT0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product RV Ranges and Water Heaters
NAICS 321991: Manufactured Home (Mobile Home) Manufacturing
SIC 2451: Mobile Homes
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 65,000
ft2
Annual Production 425,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,682 1,198,560
kWh
Electricity Demand $67,268 5,842
kW-mo/yr
Natural Gas $55,319 6,053
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,769

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1133: Adjust burners for efficient operation $3,611 $50 - - - $3,611
-
MMBtu
02 2.3212: Optimize plant power factor $17,524 $25,600 - $17,524
-
kW-mo/yr
- -
03 2.4224: Upgrade controls on compressors $7,651 $25 $3,842
57,346
kWh
$3,809
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,206 $63 $605
9,036
kWh
$601
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,030 $20,000 $1,132
16,900
kWh
$898
-
kW-mo/yr
- -
06 4.812: Apply for investment incentives $2,271 - - - $2,271 -
TOTAL RECOMMENDED $34,293 $45,738 $5,579
83,282
kWh
$22,832
-
kW-mo/yr
$2,271 $3,611
-
MMBtu
TOTAL IMPLEMENTED $16,769 $20,138 $5,579
83,282
kWh
$5,308
-
kW-mo/yr
$2,271 $3,611
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs