Assessment Year | 2011 |
---|---|
Principal Product | Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
100,000
ft2
|
Annual Production | 8,000,000
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,789 | 2,154,859 |
kWh
|
$0.041 |
Electricity Demand | $111,455 | 8,521 |
kW-mo/yr
|
$13.08 |
Natural Gas | $177,303 | 17,248 |
MMBtu
|
$10.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $122,169 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,552 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $101,575 | $193,750 |
$(-26,623.0)
(-653,496)
kWh
|
$(-11,709.0)
-
kW-mo/yr
|
$162,792
-
MMBtu
|
$(-22,885.0)
-
MMBtu
|
- | |
02 | 2.3212: Optimize plant power factor | $4,812 | $10,750 | - |
$4,812
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,660 | $3,828 |
$2,542
62,401
kWh
|
$1,118
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,762 | $290 |
$944
23,171
kWh
|
$1,818
-
kW-mo/yr
|
- | - | - | |
05 | 2.4157: Establish a predictive maintenance program | $2,144 | $2,000 |
$1,477
36,244
kWh
|
$1,700
-
kW-mo/yr
|
- | - | $(-1,033.0) | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $1,989 | $16,000 | - | - |
$1,989
-
MMBtu
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $1,677 | $1,775 |
$1,477
36,244
kWh
|
$1,700
-
kW-mo/yr
|
- | - | $(-1,500.0) | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,014 | $1,425 |
$347
8,520
kWh
|
$667
-
kW-mo/yr
|
- | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $873 | $1,000 |
$363
8,909
kWh
|
$510
-
kW-mo/yr
|
- | - | - | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $762 | $1,000 | - | - |
$912
-
MMBtu
|
- | $(-150.0) | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $694 | - |
$236
5,796
kWh
|
$458
-
kW-mo/yr
|
- | - | - | |
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $207 | $25 |
$71
1,734
kWh
|
$136
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $122,169 | $231,843 |
$(-19,166.0)
(-470,477)
kWh
|
$1,210
-
kW-mo/yr
|
$165,693
-
MMBtu
|
$(-22,885.0)
-
MMBtu
|
$(-2,683.0) | ||
TOTAL IMPLEMENTED | $7,552 | $5,090 |
$3,969
97,393
kWh
|
$5,354
-
kW-mo/yr
|
$912
-
MMBtu
|
- | $(-2,683.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs