Assessment Year | 2011 |
---|---|
Principal Product | Cutting Tools |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
74,000
ft2
|
Annual Production | 1,820,000
pieces
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $804,089 | 10,378,939 |
kWh
|
$0.077 |
Natural Gas | $8,404 | 3,181 |
MMBtu
|
$2.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $193,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $152,401 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $135,254 | $682,000 |
$105,237
1,601,771
kWh
|
$30,017
-
MMBtu
|
- | |
02 | 2.2515: Use optimum thickness insulation | $29,707 | $75,000 | - |
$29,707
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $7,355 | $11,500 | - |
$7,355
-
MMBtu
|
- | |
04 | 2.4157: Establish a predictive maintenance program | $7,105 | $1,850 |
$7,105
108,144
kWh
|
- | - | |
05 | 2.4151: Develop a repair/replace policy | $6,207 | $1,076 |
$6,207
96,127
kWh
|
- | - | |
06 | 2.3191: Use demand controller or load shedder | $4,020 | - | - | - | $4,020 | |
07 | 2.7135: Install occupancy sensors | $2,808 | $408 |
$2,808
42,746
kWh
|
- | - | |
08 | 2.6231: Utilize controls to operate equipment only when needed | $1,027 | $1,560 | - |
$1,027
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $193,483 | $773,394 |
$121,357
1,848,788
kWh
|
$68,106
-
MMBtu
|
$4,020 | ||
TOTAL IMPLEMENTED | $152,401 | $686,894 |
$121,357
1,848,788
kWh
|
$31,044
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs