ITAC Assessment: MA0528
ITAC logo
ITAC Assessment: MA0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Electrical connectors
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 206
Plant Area 130,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,460 3,562,800
kWh
Electricity Demand $90,081 10,156
kW-mo/yr
Electricity Fees $544 -
Fuel Oil #2 $35,148 4,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,855

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,973 $48,190 $23,872
439,636
kWh
$8,301
-
kW-mo/yr
$(-13,200.0)
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $9,180 $16,000 - - $9,180
-
MMBtu
03 2.2437: Recover waste heat from equipment $7,167 $9,862 - - $7,167
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $3,752 - - - $3,752
-
MMBtu
05 2.7135: Install occupancy sensors $2,103 $1,325 $2,103
38,738
kWh
- -
TOTAL RECOMMENDED $41,175 $75,377 $25,975
478,374
kWh
$8,301
-
kW-mo/yr
$6,899
-
MMBtu
TOTAL IMPLEMENTED $5,855 $1,325 $2,103
38,738
kWh
- $3,752
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs