ITAC Assessment: WV0416
ITAC logo
ITAC Assessment: WV0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product fuel and oil additives
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $100
M
to 500
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 6,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,145 5,248,800
kWh
Electricity Demand $67,047 10,346
kW-mo/yr
Natural Gas $295,121 26,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $15,244 $30,500 - - $15,244
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,496 $2,500 - - $8,616
-
MMBtu
$(-120.0)
03 2.2437: Recover waste heat from equipment $8,288 $2,374 - - $8,288
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $8,114 $22,200 - - $8,114
-
MMBtu
-
05 2.4314: Use synthetic lubricant $7,111 $2,160 $6,243
98,069
kWh
$868
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $4,926 $4,530 $4,323
67,913
kWh
$603
-
kW-mo/yr
- -
07 2.4157: Establish a predictive maintenance program $4,558 $1,000 $4,389
68,950
kWh
$609
-
kW-mo/yr
- $(-440.0)
08 2.4151: Develop a repair/replace policy $3,797 $830 $3,752
58,931
kWh
$525
-
kW-mo/yr
- $(-480.0)
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,776 $1,360 $3,316
52,084
kWh
$460
-
kW-mo/yr
- -
10 2.4312: Improve lubrication practices $1,031 $938 $895
14,064
kWh
$136
-
kW-mo/yr
- -
11 2.7447: Install vinyl strip / high speed / air curtain doors $688 $280 - - $688
-
MMBtu
-
TOTAL RECOMMENDED $66,029 $68,672 $22,918
360,011
kWh
$3,201
-
kW-mo/yr
$40,950
-
MMBtu
$(-1,040.0)
TOTAL IMPLEMENTED $20,627 $5,690 $11,457
179,965
kWh
$1,594
-
kW-mo/yr
$8,616
-
MMBtu
$(-1,040.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs