ITAC Assessment: WV0414
ITAC logo
ITAC Assessment: WV0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product PVC fill media for cooling tower and waste water treatment
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 120,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,561 4,570,983
kWh
Electricity Demand $165,446 15,498
kW-mo/yr
Natural Gas $48,630 4,461
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $22,889 $18,300 $(-358.0)
(-9,053)
kWh
- $23,597
-
MMBtu
$(-350.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,304 $42,420 $6,911
174,953
kWh
$5,393
-
kW-mo/yr
- -
03 2.5123: Reduce fluid flow rates $7,185 $280 $4,034
102,114
kWh
$3,151
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,064 $15,400 $3,405
86,191
kWh
$2,659
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $3,414 $400 - - $3,414
-
MMBtu
-
06 2.7231: Use radiant heater for spot heating $3,403 $5,310 - - $3,403
-
MMBtu
-
07 2.2628: Utilize a less expensive cooling method $2,505 $14,000 $1,341
33,953
kWh
$1,164
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,467 $3,614 $730
18,475
kWh
$737
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $1,409 $835 $790
20,001
kWh
$619
-
kW-mo/yr
- -
10 2.4311: Recover mechanical energy $1,362 $1,000 $945
23,935
kWh
$737
-
kW-mo/yr
- $(-320.0)
11 2.7224: Reduce space conditioning during non-working hours $1,335 $1,070 - - $1,335
-
MMBtu
-
12 2.4151: Develop a repair/replace policy $1,318 $740 $941
23,816
kWh
$737
-
kW-mo/yr
- $(-360.0)
13 2.4312: Improve lubrication practices $413 $465 $231
5,860
kWh
$182
-
kW-mo/yr
- -
14 2.7492: Use proper thickness of insulation on building envelope $388 $1,735 - - $388
-
MMBtu
-
TOTAL RECOMMENDED $65,456 $105,569 $18,970
480,245
kWh
$15,379
-
kW-mo/yr
$32,137
-
MMBtu
$(-1,030.0)
TOTAL IMPLEMENTED $25,359 $50,859 $13,561
343,293
kWh
$10,755
-
kW-mo/yr
$1,723
-
MMBtu
$(-680.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs