Assessment Year | 1999 |
---|---|
Principal Product | Gear Drives |
NAICS |
n/a
|
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
161,700
ft2
|
Annual Production | 170,000
pieces
|
Production Hrs. Annual | 6,380
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $244,513 | 7,571,806 |
kWh
|
$0.032 |
Electricity Demand | $103,966 | 15,036 |
kW-mo/yr
|
$6.91 |
Electricity Fees | $21,332 | - |
|
- |
Natural Gas | $97,023 | 25,570 |
MMBtu
|
$3.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,765 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,262 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,448 | $7,644 |
$2,445
76,495
kWh
|
$1,003
-
kW-mo/yr
|
- | - | - | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $988 | $750 | - |
$988
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $3,384 | $2,175 | - | - |
$3,384
-
MMBtu
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,845 | $100 |
$1,845
57,737
kWh
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,359 | $300 |
$969
30,188
kWh
|
$390
-
kW-mo/yr
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $2,683 | $756 |
$2,069
64,478
kWh
|
$614
-
kW-mo/yr
|
- | - | - | |
07 | 3.7137: Replace cloth rags with paper towels | $42,908 | $3,800 | - | - | - | - | $42,908 | |
08 | 2.4321: Upgrade obsolete equipment | $1,750 | $1,000 | - | - | - | $1,750 | - | |
09 | 2.4321: Upgrade obsolete equipment | $8,400 | $55,000 | - | - | - | $8,400 | - | |
TOTAL RECOMMENDED | $66,765 | $71,525 |
$7,328
228,898
kWh
|
$2,995
-
kW-mo/yr
|
$3,384
-
MMBtu
|
$10,150 | $42,908 | ||
TOTAL IMPLEMENTED | $56,262 | $60,200 |
$2,814
87,925
kWh
|
$390
-
kW-mo/yr
|
- | $10,150 | $42,908 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs