Assessment Year | 2009 |
---|---|
Principal Product | Bed Pillows |
NAICS | 314120: Curtain and Linen Mills |
SIC | 2392: House furnishing, Except Curtains and Draperies |
Sales Range | $50 M to 100M |
# of Employees | 237 |
Plant Area |
190,000
ft2
|
Annual Production | 3,500,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $224,789 | 2,784,600 |
kWh
|
$0.081 |
Electricity Demand | $41,017 | 6,167 |
kW-mo/yr
|
$6.65 |
Electricity Fees | $413 | - |
|
- |
Natural Gas | $104,347 | 7,411 |
MMBtu
|
$14.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,197 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $43,474 | $56,368 |
$35,893
444,601
kWh
|
$7,581
-
kW-mo/yr
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $7,123 | $12,560 |
$5,879
72,823
kWh
|
$1,244
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,978 | - |
$4,936
61,140
kWh
|
$1,042
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $4,801 | $1,480 | - | - |
$4,801
-
MMBtu
|
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $4,208 | $47 |
$3,476
43,056
kWh
|
$732
-
kW-mo/yr
|
- | |
06 | 2.3212: Optimize plant power factor | $3,260 | $4,450 |
$3,260
-
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,818 | $148 |
$2,327
28,838
kWh
|
$491
-
kW-mo/yr
|
- | |
08 | 2.4151: Develop a repair/replace policy | $2,515 | $651 |
$2,023
27,140
kWh
|
$492
-
kW-mo/yr
|
- | |
09 | 2.7241: Install outside air damper / economizer on hvac unit | $2,292 | $3,840 |
$1,703
21,096
kWh
|
$589
-
kW-mo/yr
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,892 | - |
$1,559
19,314
kWh
|
$333
-
kW-mo/yr
|
- | |
11 | 2.4221: Install compressor air intakes in coolest locations | $1,753 | $460 |
$1,447
17,921
kWh
|
$306
-
kW-mo/yr
|
- | |
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,520 | $28 |
$1,255
15,552
kWh
|
$265
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $81,634 | $80,032 |
$63,758
751,481
kWh
|
$13,075
-
kW-mo/yr
|
$4,801
-
MMBtu
|
||
TOTAL IMPLEMENTED | $58,197 | $57,195 |
$47,993
596,585
kWh
|
$10,204
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs