ITAC Assessment: WV0371
ITAC logo
ITAC Assessment: WV0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Galvanized Steel
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 160,000
ft2
Annual Production 700,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,447,260 58,798,678
kWh
Electricity Demand $772,077 116,784
kW-mo/yr
Natural Gas $5,097,957 592,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $861,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $592,005

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1133: Adjust burners for efficient operation $284,875 $10,157 - - $284,875
-
MMBtu
-
02 2.1133: Adjust burners for efficient operation $249,839 $8,000 - - $249,839
-
MMBtu
-
03 2.2422: Use waste heat from hot flue gases to generate steam $179,387 $235,000 - - $179,387
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $42,970 $2,500 - - $43,060
-
MMBtu
$(-90.0)
05 2.4151: Develop a repair/replace policy $29,665 $1,823 $21,821
887,016
kWh
$7,934
-
kW-mo/yr
- $(-90.0)
06 2.4224: Upgrade controls on compressors $19,620 $8,395 $14,203
577,377
kWh
$5,417
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $16,829 $2,310 $13,531
550,039
kWh
$3,298
-
kW-mo/yr
- -
08 2.2136: Install / repair insulation on steam lines $14,852 $2,980 - - $14,852
-
MMBtu
-
09 2.4157: Establish a predictive maintenance program $13,433 $3,500 $10,825
440,039
kWh
$3,938
-
kW-mo/yr
- $(-1,330.0)
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,725 $683 $4,602
187,068
kWh
$1,123
-
kW-mo/yr
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $4,269 $530 $3,065
124,611
kWh
$1,204
-
kW-mo/yr
- -
TOTAL RECOMMENDED $861,464 $275,878 $68,047
2,766,150
kWh
$22,914
-
kW-mo/yr
$772,013
-
MMBtu
$(-1,510.0)
TOTAL IMPLEMENTED $592,005 $259,483 $53,844
2,188,773
kWh
$17,497
-
kW-mo/yr
$522,174
-
MMBtu
$(-1,510.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs