ITAC Assessment: MUCM07
ITAC logo
ITAC Assessment: MUCM07
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Auto Parts
NAICS 541380: Testing Laboratories
SIC 8711: Engineering Services
Sales Range less than $500
k
# of Employees 140
Plant Area 50,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,570 1,148,000
kWh
Electricity Demand $119,361 2,813
kW-mo/yr
Electricity Fees $5,652 -
Natural Gas $9,575 1,227
MMBtu
Waste Disposal Costs
Water Usage $10,090 777
Tgal
TOTAL YEARLY COSTS $168,248
RECOMMENDED SAVINGS* $4,722 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,473 $3,866 $502
16,726
kWh
$972
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $693 $1,199 $236
7,859
kWh
$457
-
kW-mo/yr
-
03 3.4151: Minimize water usage $2,556 $11,427 - - $2,556
-
Tgal
TOTAL RECOMMENDED $4,722 $16,492 $738
24,585
kWh
$1,429
-
kW-mo/yr
$2,556
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs