ITAC Assessment: LS1813
ITAC logo
ITAC Assessment: LS1813
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Industrial Gases
NAICS 325120: Industrial Gas Manufacturing
SIC 2813: Industrial Gases
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 226,000
ft2
Annual Production 180
Tgal
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,498 887,553
kWh
TOTAL YEARLY COSTS $101,498
RECOMMENDED SAVINGS* $25,501 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $323 $25 $323
2,821
kWh
02 2.7261: Install timers and/or thermostats $1,597 $225 $1,597
14,008
kWh
03 2.7447: Install vinyl strip / high speed / air curtain doors $63 $78 $63
554
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,209 $20,445 $15,209
133,414
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,309 $15,000 $8,309
72,657
kWh
TOTAL RECOMMENDED $25,501 $35,773 $25,501
223,454
kWh