ITAC Assessment: TN0448
ITAC logo
ITAC Assessment: TN0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PAINT BRUSHES & ROLLERS
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 19,900,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,958 1,839,390
kWh
Natural Gas $14,008 2,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $11,065 $1,820 - $11,065
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $6,674 $360 $6,254
113,716
kWh
- $420
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,031 $2,450 $2,031
36,928
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $854 $240 $854
15,533
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,018 $650 $2,665
48,359
kWh
- $(-647.0)
TOTAL RECOMMENDED $22,642 $5,520 $11,804
214,536
kWh
$11,065
-
MMBtu
$(-227.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs