ITAC Assessment: UM0106
ITAC logo
ITAC Assessment: UM0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Coolant Reservoirs
NAICS
n/a
SIC 2789: Bookbinding and Related Work
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 5,500,000
units
Production Hrs. Annual 6,336
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,300 2,760,258
kWh
Electricity Demand $57,890 6,516
kW-mo/yr
Natural Gas $7,220 1,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $866 $1,540 n/a $604
17,878
kWh
$262
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $727 $1,000 n/a $679
13,482
kWh
$48
-
kW-mo/yr
- - -
03 3.5316: Contract a wood pallet recycling company $3,250 $100 n/a - - - $3,250
-
lb
-
04 3.4111: Use closed cycle process to minimize waste water production $1,804 $1,580 n/a - - $1,804
-
Tgal
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,065 $9,154 n/a - - - - $16,065
06 4.631: Install an uninteruptable power supply $27,848 $10,800 n/a - - - - $27,848
TOTAL RECOMMENDED $50,560 $24,174 $1,283
31,360
kWh
$310
-
kW-mo/yr
$1,804
-
Tgal
$3,250
-
lb
$43,913
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs