ITAC Assessment: WV0369
ITAC logo
ITAC Assessment: WV0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 311
Plant Area 700,000
ft2
Annual Production 130
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $554,848 13,471,510
kWh
Electricity Demand $177,315 33,497
kW-mo/yr
Electricity Fees $1,838 -
Natural Gas $737,772 73,846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $314,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $206,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $108,677 - - - - - - $108,677
02 2.7243: Improve air circulation with destratification fans / other methods $77,536 $198,000 $(-7,184.0)
(-174,377)
kWh
$(-2,962.0)
-
kW-mo/yr
- $87,682
-
MMBtu
- -
03 2.7231: Use radiant heater for spot heating $48,102 $41,400 - - - $48,102
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,982 $71,794 $13,449
326,443
kWh
$5,533
-
kW-mo/yr
- - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,912 $8,070 - $16,912
-
kW-mo/yr
- - - -
06 2.3212: Optimize plant power factor $7,680 $24,500 - - $7,680 - - -
07 2.2522: Isolate hot or cold equipment $5,682 $952 $(-85.0)
(-2,051)
kWh
$(-37.0)
-
kW-mo/yr
- $5,804
-
MMBtu
- -
08 2.2437: Recover waste heat from equipment $5,504 $2,520 - - - $5,504
-
MMBtu
- -
09 2.2414: Use waste heat from hot flue gases to preheat $5,365 $11,160 - - - $5,365
-
MMBtu
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $4,950 - $3,506
85,080
kWh
$1,444
-
kW-mo/yr
- - - -
11 2.4157: Establish a predictive maintenance program $2,687 $1,000 $2,165
52,547
kWh
$889
-
kW-mo/yr
- - $(-367.0) -
12 2.1233: Analyze flue gas for proper air/fuel ratio $2,264 $2,000 - - - $2,378
-
MMBtu
$(-114.0) -
13 2.4151: Develop a repair/replace policy $2,047 $776 $1,449
35,160
kWh
$598
-
kW-mo/yr
- - - -
14 2.2511: Insulate bare equipment $2,008 $1,241 - - - $2,008
-
MMBtu
- -
15 2.4221: Install compressor air intakes in coolest locations $2,004 $87 $1,570
38,098
kWh
$434
-
kW-mo/yr
- - - -
16 2.4231: Reduce the pressure of compressed air to the minimum required $1,266 $114 $991
24,047
kWh
$275
-
kW-mo/yr
- - - -
17 2.4111: Utilize energy-efficient belts and other improved mechanisms $835 - $592
14,357
kWh
$243
-
kW-mo/yr
- - - -
18 2.2628: Utilize a less expensive cooling method $819 $1,484 $560
13,604
kWh
$259
-
kW-mo/yr
- - - -
19 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $563 $585 $441
10,712
kWh
$122
-
kW-mo/yr
- - - -
20 2.4239: Eliminate or reduce compressed air usage $389 $470 $304
7,371
kWh
$85
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $314,272 $366,153 $17,758
430,991
kWh
$23,795
-
kW-mo/yr
$7,680 $156,843
-
MMBtu
$(-481.0) $108,677
TOTAL IMPLEMENTED $206,132 $144,832 $22,812
553,666
kWh
$9,152
-
kW-mo/yr
$7,680 $58,292
-
MMBtu
$(-481.0) $108,677
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs