Assessment Year | 2007 |
---|---|
Principal Product | Fans and Blowers for HVAC units |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 107 |
Plant Area |
90,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,185 | 2,433,655 |
kWh
|
$0.066 |
Electricity Demand | $66,074 | 5,260 |
kW-mo/yr
|
$12.56 |
Natural Gas | $39,543 | 2,478 |
MMBtu
|
$15.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,335 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,286 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,251 | $20,735 |
$8,440
127,483
kWh
|
$4,811
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,342 | - |
$5,315
80,282
kWh
|
$3,027
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $7,515 | $540 | - | - | - |
$7,515
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,238 | $5,148 |
$3,776
57,036
kWh
|
$2,462
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,696 | $1,315 |
$3,823
57,756
kWh
|
$2,173
-
kW-mo/yr
|
- | - | $(-300.0) | |
06 | 2.3191: Use demand controller or load shedder | $5,275 | $7,600 | - |
$5,275
-
kW-mo/yr
|
- | - | - | |
07 | 2.4157: Establish a predictive maintenance program | $4,217 | $1,000 |
$3,026
45,708
kWh
|
$1,721
-
kW-mo/yr
|
- | - | $(-530.0) | |
08 | 2.4239: Eliminate or reduce compressed air usage | $3,400 | $1,050 |
$2,458
37,125
kWh
|
$942
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,252 | - |
$2,071
31,280
kWh
|
$1,181
-
kW-mo/yr
|
- | - | - | |
10 | 2.4151: Develop a repair/replace policy | $2,440 | $898 |
$2,017
30,472
kWh
|
$1,143
-
kW-mo/yr
|
- | - | $(-720.0) | |
11 | 2.7241: Install outside air damper / economizer on hvac unit | $2,157 | $1,030 |
$1,378
20,819
kWh
|
$779
-
kW-mo/yr
|
- | - | - | |
12 | 2.2612: Use cooling tower water instead of refrigeration | $1,770 | $5,600 |
$1,280
19,338
kWh
|
$490
-
kW-mo/yr
|
- | - | - | |
13 | 2.3212: Optimize plant power factor | $1,723 | $5,600 | - | - | $1,723 | - | - | |
14 | 2.4221: Install compressor air intakes in coolest locations | $1,641 | $165 |
$1,189
17,954
kWh
|
$452
-
kW-mo/yr
|
- | - | - | |
15 | 2.2628: Utilize a less expensive cooling method | $751 | $1,641 |
$311
4,700
kWh
|
$440
-
kW-mo/yr
|
- | - | - | |
16 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $667 | $282 |
$483
7,291
kWh
|
$184
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $68,335 | $52,604 |
$35,567
537,244
kWh
|
$25,080
-
kW-mo/yr
|
$1,723 |
$7,515
-
MMBtu
|
$(-1,550.0) | ||
TOTAL IMPLEMENTED | $43,286 | $29,428 |
$28,383
428,725
kWh
|
$15,923
-
kW-mo/yr
|
- | - | $(-1,020.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs