| Assessment Year | 1989 |
|---|---|
| Principal Product | NEWSPAPERS & MAGAZINES |
| NAICS |
n/a
|
| SIC | 2759: Commercial Printing, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 400,000,000
pieces
|
| Production Hrs. Annual | 7,072
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $139,508 | 1,968,054 |
kWh
|
$0.071 |
| Natural Gas | $15,767 | 3,887 |
MMBtu
|
$4.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,542 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,973 | $270 |
$1,973
27,843
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,991 | $2,800 |
$2,991
42,204
kWh
|
- | - | |
| 03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,994 | $3,600 |
$1,994
28,136
kWh
|
- | - | |
| 04 | 2.7261: Install timers and/or thermostats | $2,121 | $670 |
$789
11,137
kWh
|
$1,332
-
MMBtu
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,076 | $522 |
$582
8,206
kWh
|
$1,494
-
MMBtu
|
- | |
| 06 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $319 | $82 |
$104
1,465
kWh
|
$215
-
MMBtu
|
- | |
| 07 | 2.6121: Reduce hot water temperature to the minimum required | $329 | $50 | - |
$329
-
MMBtu
|
- | |
| 08 | 3.7214: Reduce or eliminate waste | $800 | $50 | - | - | $800 | |
| TOTAL RECOMMENDED | $12,603 | $8,044 |
$8,433
118,991
kWh
|
$3,370
-
MMBtu
|
$800 | ||
| TOTAL IMPLEMENTED | $5,542 | $1,122 |
$2,866
40,445
kWh
|
$1,876
-
MMBtu
|
$800 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs