ITAC Assessment: KU0282
ITAC logo
ITAC Assessment: KU0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product NEWSPAPERS & MAGAZINES
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 400,000,000
pieces
Production Hrs. Annual 7,072
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,508 1,968,054
kWh
Natural Gas $15,767 3,887
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,973 $270 $1,973
27,843
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,991 $2,800 $2,991
42,204
kWh
- -
03 2.2621: Modify refrigeration system to operate at a lower pressure $1,994 $3,600 $1,994
28,136
kWh
- -
04 2.7261: Install timers and/or thermostats $2,121 $670 $789
11,137
kWh
$1,332
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,076 $522 $582
8,206
kWh
$1,494
-
MMBtu
-
06 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $319 $82 $104
1,465
kWh
$215
-
MMBtu
-
07 2.6121: Reduce hot water temperature to the minimum required $329 $50 - $329
-
MMBtu
-
08 3.7214: Reduce or eliminate waste $800 $50 - - $800
TOTAL RECOMMENDED $12,603 $8,044 $8,433
118,991
kWh
$3,370
-
MMBtu
$800
TOTAL IMPLEMENTED $5,542 $1,122 $2,866
40,445
kWh
$1,876
-
MMBtu
$800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs