ITAC Assessment: WV0364
ITAC logo
ITAC Assessment: WV0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Sprockets, Gears, Connecting Rods
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 394
Plant Area 80,000,000
ft2
Annual Production 48,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,478,639 59,027,346
kWh
Electricity Demand $1,011,123 110,990
kW-mo/yr
Electricity Fees $28,130 -
Natural Gas $144,296 12,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $175,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3191: Use demand controller or load shedder $37,506 $7,700 - $37,506
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $29,507 $12,903 $17,099
681,225
kWh
$12,408
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $28,283 - $16,385
652,804
kWh
$11,898
-
kW-mo/yr
- -
04 2.1135: Repair furnaces and oven doors so that they seal efficiently $25,424 $32,700 $25,424
1,012,901
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,229 $40,317 $9,406
374,730
kWh
$6,823
-
kW-mo/yr
- -
06 2.4151: Develop a repair/replace policy $12,941 $840 $7,701
306,832
kWh
$5,590
-
kW-mo/yr
- $(-350.0)
07 2.6214: Shut off pilots in standby equipment $7,757 $10,000 - - $22,317
-
MMBtu
$(-14,560.0)
08 2.4221: Install compressor air intakes in coolest locations $6,774 $640 $4,560
181,660
kWh
$2,214
-
kW-mo/yr
- -
09 2.7241: Install outside air damper / economizer on hvac unit $3,398 $1,070 $2,250
89,658
kWh
$1,148
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,627 $5,578 $2,408
95,927
kWh
$219
-
kW-mo/yr
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,393 $375 $1,610
64,141
kWh
$783
-
kW-mo/yr
- -
12 2.4231: Reduce the pressure of compressed air to the minimum required $1,696 $140 $1,140
45,415
kWh
$556
-
kW-mo/yr
- -
13 2.2628: Utilize a less expensive cooling method $1,174 $2,445 $791
31,514
kWh
$383
-
kW-mo/yr
- -
TOTAL RECOMMENDED $175,709 $114,708 $88,774
3,536,807
kWh
$79,528
-
kW-mo/yr
$22,317
-
MMBtu
$(-14,910.0)
TOTAL IMPLEMENTED $119,100 $92,853 $81,173
3,233,975
kWh
$38,277
-
kW-mo/yr
- $(-350.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings