ITAC Assessment: MO0239
ITAC logo
ITAC Assessment: MO0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automobile Glove Box Doors and Instrament Panels
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 82,035
ft2
Annual Production 554,749
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,327 13,610,199
kWh
Electricity Demand $333,096 2,383
kW-mo/yr
Electricity Fees $111,119 -
Natural Gas $303,651 68,449
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,003,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,344

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.4314: Use synthetic lubricant $2,054 $5,060 - - - $2,054
02 4.611: Begin a practice of predictive / preventative maintenance $1,725 $3,200 - - - $1,725
03 2.7142: Utilize higher efficiency lamps and/or ballasts $464 $345 - - - $464
04 2.1321: Replace fossil fuel equipment with electrical equipment $195 $590 $55
1,465
kWh
$140
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,350 $7,203 $2,554
67,995
kWh
$2,796
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,666 $120 $2,268
60,375
kWh
$1,398
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $2,694 $183 $2,554
67,995
kWh
$140
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $9,880 $15,338 $4,988
132,767
kWh
$4,892
-
kW-mo/yr
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,527 - $1,850
49,238
kWh
$1,677
-
kW-mo/yr
- -
10 3.5212: Regrind, reuse, or sell scrap plastic parts $898,000 - - - $898,000
-
lb
-
11 3.5315: Lease / purchase baler; sell cardboard to recycler $76,000 - - - $76,000
-
lb
-
TOTAL RECOMMENDED $1,003,555 $32,039 $14,269
379,835
kWh
$11,043
-
kW-mo/yr
$974,000
-
lb
$4,243
TOTAL IMPLEMENTED $86,344 $15,683 $4,988
132,767
kWh
$4,892
-
kW-mo/yr
$76,000
-
lb
$464
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs