ITAC Assessment: WV0363
ITAC logo
ITAC Assessment: WV0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Printed Signs and Decals for Vending Machines
NAICS 323113: Commercial Screen Printing
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 100,000
ft2
Annual Production 1,080,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,286 3,331,756
kWh
Other Energy $31,114 1,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,046 $8,058 $18,046
287,269
kWh
- - -
02 2.2437: Recover waste heat from equipment $12,878 $8,630 - $16,878
-
MMBtu
- $(-4,000.0)
03 2.7232: Replace existing hvac unit with high efficiency model $12,259 $122,100 $12,259
198,138
kWh
- - -
04 2.8112: Combine utility meters $11,248 $12,500 - - $11,248 -
05 2.7111: Reduce illumination to minimum necessary levels $8,928 $511 $8,928
142,114
kWh
- - -
06 2.7241: Install outside air damper / economizer on hvac unit $8,228 $9,945 $8,228
130,971
kWh
- - -
07 2.4224: Upgrade controls on compressors $7,036 $984 $7,036
112,008
kWh
- - -
08 2.4239: Eliminate or reduce compressed air usage $5,820 $183 $5,820
92,664
kWh
- - -
09 2.7261: Install timers and/or thermostats $3,839 $1,105 $187
3,040
kWh
$3,652
-
MMBtu
- -
10 2.2711: Utilize outside air instead of conditioned air for drying $2,611 $4,505 - $2,611
-
MMBtu
- -
TOTAL RECOMMENDED $90,893 $168,521 $60,504
966,204
kWh
$23,141
-
MMBtu
$11,248 $(-4,000.0)
TOTAL IMPLEMENTED $68,770 $153,932 $53,281
851,156
kWh
$19,489
-
MMBtu
- $(-4,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Energy Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs