Assessment Year | 2007 |
---|---|
Principal Product | Flexible Packaging |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
67,000
ft2
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,593 | 7,875,519 |
kWh
|
$0.028 |
Electricity Demand | $119,892 | 13,740 |
kW-mo/yr
|
$8.73 |
Electricity Fees | $5,000 | - |
|
- |
Natural Gas | $76,040 | 5,669 |
MMBtu
|
$13.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $105,018 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,665 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $46,761 | $33,200 | - | - |
$46,761
-
MMBtu
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $15,205 | $2,100 |
$11,765
419,874
kWh
|
$3,440
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $14,128 | $900 | - | - |
$14,128
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,520 | $15,381 |
$8,325
297,102
kWh
|
$3,195
-
kW-mo/yr
|
- | - | |
05 | 2.4157: Establish a predictive maintenance program | $3,489 | $1,000 |
$2,808
100,206
kWh
|
$1,225
-
kW-mo/yr
|
- | $(-544.0) | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,629 | - |
$2,529
90,244
kWh
|
$1,100
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,596 | $32 |
$2,011
71,648
kWh
|
$585
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,776 | - |
$1,236
44,142
kWh
|
$540
-
kW-mo/yr
|
- | - | |
09 | 2.2628: Utilize a less expensive cooling method | $1,465 | $1,032 |
$1,020
36,418
kWh
|
$445
-
kW-mo/yr
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $1,332 | $186 |
$1,034
36,828
kWh
|
$298
-
kW-mo/yr
|
- | - | |
11 | 2.4151: Develop a repair/replace policy | $1,190 | $408 |
$1,363
48,638
kWh
|
$595
-
kW-mo/yr
|
- | $(-768.0) | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,070 | $1,044 |
$747
26,727
kWh
|
$323
-
kW-mo/yr
|
- | - | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $857 | $504 |
$665
23,777
kWh
|
$192
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $105,018 | $55,787 |
$33,503
1,195,604
kWh
|
$11,938
-
kW-mo/yr
|
$60,889
-
MMBtu
|
$(-1,312.0) | ||
TOTAL IMPLEMENTED | $27,665 | $2,844 |
$10,612
378,655
kWh
|
$4,237
-
kW-mo/yr
|
$14,128
-
MMBtu
|
$(-1,312.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs