ITAC Assessment: WV0352
ITAC logo
ITAC Assessment: WV0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Commercial Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 55,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,646 1,662,228
kWh
Electricity Fees $2,349 -
Natural Gas $17,511 989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,392

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $7,713 $170 $7,713
76,427
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,003 $15,353 $7,003
69,503
kWh
- -
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,862 $3,440 $1,862
18,459
kWh
- -
04 2.7122: Disconnect ballasts $1,803 $1,500 $1,803
17,971
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,773 $1,431 $1,773
17,689
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $1,241 $1,335 $1,241
12,306
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $857 $25 $857
8,497
kWh
- -
08 2.7135: Install occupancy sensors $857 $700 $857
8,494
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $702 $13 $1,152
11,441
kWh
- $(-450.0)
10 2.2628: Utilize a less expensive cooling method $473 $325 $473
4,688
kWh
- -
11 2.7447: Install vinyl strip / high speed / air curtain doors $460 $735 $236
2,344
kWh
$224
-
MMBtu
-
12 2.2625: Chill water to the highest temperature possible $325 $38 $325
3,213
kWh
- -
TOTAL RECOMMENDED $25,069 $25,065 $25,295
251,032
kWh
$224
-
MMBtu
$(-450.0)
TOTAL IMPLEMENTED $14,392 $7,876 $14,392
142,852
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs