Assessment Year | 2006 |
---|---|
Principal Product | Commercial Printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
55,000
ft2
|
Annual Production | 6,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,646 | 1,662,228 |
kWh
|
$0.10 |
Electricity Fees | $2,349 | - |
|
- |
Natural Gas | $17,511 | 989 |
MMBtu
|
$17.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,069 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,392 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $7,713 | $170 |
$7,713
76,427
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,003 | $15,353 |
$7,003
69,503
kWh
|
- | - | |
03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,862 | $3,440 |
$1,862
18,459
kWh
|
- | - | |
04 | 2.7122: Disconnect ballasts | $1,803 | $1,500 |
$1,803
17,971
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,773 | $1,431 |
$1,773
17,689
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,241 | $1,335 |
$1,241
12,306
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $857 | $25 |
$857
8,497
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $857 | $700 |
$857
8,494
kWh
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $702 | $13 |
$1,152
11,441
kWh
|
- | $(-450.0) | |
10 | 2.2628: Utilize a less expensive cooling method | $473 | $325 |
$473
4,688
kWh
|
- | - | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $460 | $735 |
$236
2,344
kWh
|
$224
-
MMBtu
|
- | |
12 | 2.2625: Chill water to the highest temperature possible | $325 | $38 |
$325
3,213
kWh
|
- | - | |
TOTAL RECOMMENDED | $25,069 | $25,065 |
$25,295
251,032
kWh
|
$224
-
MMBtu
|
$(-450.0) | ||
TOTAL IMPLEMENTED | $14,392 | $7,876 |
$14,392
142,852
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs