| Assessment Year | 2006 |
|---|---|
| Principal Product | Commercial Printing |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2759: Commercial Printing, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
55,000
ft2
|
| Annual Production | 6,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $167,646 | 1,662,228 |
kWh
|
$0.10 |
| Electricity Fees | $2,349 | - |
|
- |
| Natural Gas | $17,511 | 989 |
MMBtu
|
$17.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,069 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,392 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $7,713 | $170 |
$7,713
76,427
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,003 | $15,353 |
$7,003
69,503
kWh
|
- | - | |
| 03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,862 | $3,440 |
$1,862
18,459
kWh
|
- | - | |
| 04 | 2.7122: Disconnect ballasts | $1,803 | $1,500 |
$1,803
17,971
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,773 | $1,431 |
$1,773
17,689
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,241 | $1,335 |
$1,241
12,306
kWh
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $857 | $25 |
$857
8,497
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $857 | $700 |
$857
8,494
kWh
|
- | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $702 | $13 |
$1,152
11,441
kWh
|
- | $(-450.0) | |
| 10 | 2.2628: Utilize a less expensive cooling method | $473 | $325 |
$473
4,688
kWh
|
- | - | |
| 11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $460 | $735 |
$236
2,344
kWh
|
$224
-
MMBtu
|
- | |
| 12 | 2.2625: Chill water to the highest temperature possible | $325 | $38 |
$325
3,213
kWh
|
- | - | |
| TOTAL RECOMMENDED | $25,069 | $25,065 |
$25,295
251,032
kWh
|
$224
-
MMBtu
|
$(-450.0) | ||
| TOTAL IMPLEMENTED | $14,392 | $7,876 |
$14,392
142,852
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs