ITAC Assessment: WV0349
ITAC logo
ITAC Assessment: WV0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Permanent and semi-permanent aluminum castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 156,000
ft2
Annual Production 14,721,119
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,602 13,436,088
kWh
Electricity Demand $199,593 26,516
kW-mo/yr
Electricity Fees $2,858 -
Natural Gas $2,940,494 276,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,686 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2442: Preheat combustion air with waste heat $167,255 $32,010 - - - $167,255
-
MMBtu
-
02 2.2426: Use waste heat from flue gases to heat space conditioning air $48,286 $39,350 $(-986.0)
(-17,580)
kWh
$(-632.0)
-
kW-mo/yr
- $49,904
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $14,527 $640 - - - $14,527
-
MMBtu
-
04 2.7314: Reduce ventilation air $13,672 $10,295 $2,992
53,326
kWh
$1,661
-
kW-mo/yr
- $9,019
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $10,522 $600 $8,193
146,016
kWh
$2,329
-
kW-mo/yr
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,322 $3,250 - $7,322
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $5,242 $400 $4,077
72,604
kWh
$1,165
-
kW-mo/yr
- - -
08 2.4157: Establish a predictive maintenance program $4,291 $1,000 $3,008
53,619
kWh
$1,400
-
kW-mo/yr
- - $(-117.0)
09 2.2511: Insulate bare equipment $3,740 $1,318 - - - $3,740
-
MMBtu
-
10 2.3212: Optimize plant power factor $3,456 $10,700 - - $3,456 - -
11 2.4151: Develop a repair/replace policy $1,998 $512 $1,743
31,058
kWh
$855
-
kW-mo/yr
- - $(-600.0)
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $375 $200 $263
4,688
kWh
$112
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $280,686 $100,275 $19,290
343,731
kWh
$14,212
-
kW-mo/yr
$3,456 $244,445
-
MMBtu
$(-717.0)
TOTAL IMPLEMENTED $92,131 $53,715 $11,097
197,715
kWh
$4,561
-
kW-mo/yr
- $77,190
-
MMBtu
$(-717.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs