Assessment Year | 2006 |
---|---|
Principal Product | Industrial Storage Bins |
NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
190,000
ft2
|
Annual Production | 24,500,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $899,353 | 13,300,200 |
kWh
|
$0.068 |
Electricity Demand | $200,721 | 22,768 |
kW-mo/yr
|
$8.82 |
Electricity Fees | $1,689 | - |
|
- |
Natural Gas | $106,204 | 10,148 |
MMBtu
|
$10.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,653 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,261 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $50,392 | $80,000 | - | - | - |
$50,392
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,971 | $13,343 |
$17,146
327,210
kWh
|
$4,825
-
kW-mo/yr
|
- | - | - | |
03 | 2.3212: Optimize plant power factor | $20,449 | $12,020 | - | - | $20,449 | - | - | |
04 | 2.4151: Develop a repair/replace policy | $11,461 | $648 |
$9,916
189,278
kWh
|
$2,385
-
kW-mo/yr
|
- | - | $(-840.0) | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,398 | $350 | - |
$5,398
-
kW-mo/yr
|
- | - | - | |
06 | 2.7314: Reduce ventilation air | $3,560 | $892 |
$768
14,650
kWh
|
$185
-
kW-mo/yr
|
- |
$2,607
-
MMBtu
|
- | |
07 | 2.7135: Install occupancy sensors | $2,103 | $473 |
$2,103
40,141
kWh
|
- | - | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $1,543 | $650 |
$829
15,739
kWh
|
$714
-
kW-mo/yr
|
- | - | - | |
09 | 2.2628: Utilize a less expensive cooling method | $1,275 | $2,748 |
$1,028
19,631
kWh
|
$247
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,226 | - |
$744
14,209
kWh
|
$482
-
kW-mo/yr
|
- | - | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $874 | $145 |
$706
13,444
kWh
|
$168
-
kW-mo/yr
|
- | - | - | |
12 | 2.4239: Eliminate or reduce compressed air usage | $401 | $170 |
$322
6,153
kWh
|
$79
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $120,653 | $111,439 |
$33,562
640,455
kWh
|
$14,483
-
kW-mo/yr
|
$20,449 |
$52,999
-
MMBtu
|
$(-840.0) | ||
TOTAL IMPLEMENTED | $70,261 | $31,439 |
$33,562
640,455
kWh
|
$14,483
-
kW-mo/yr
|
$20,449 |
$2,607
-
MMBtu
|
$(-840.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs