ITAC Assessment: WV0327
ITAC logo
ITAC Assessment: WV0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Water Based Adhesives
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 44,000
ft2
Annual Production 22,000,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,718 1,310,808
kWh
Natural Gas $157,567 15,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,085 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $11,686 $2,140 - $11,686
-
MMBtu
- -
02 2.2424: Use heat in flue gases to preheat products or materials $9,890 $3,960 - $9,890
-
MMBtu
- -
03 2.2414: Use waste heat from hot flue gases to preheat $8,323 $3,960 - $8,323
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,759 $1,000 - $2,807
-
MMBtu
- $(-48.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,613 $2,644 $1,613
30,772
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,057 $696 $1,057
20,217
kWh
- - -
07 2.2437: Recover waste heat from equipment $476 $632 - $476
-
MMBtu
- -
08 2.4314: Use synthetic lubricant $415 $24 $415
8,030
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $388 $176 $476
9,093
kWh
- - $(-88.0)
10 2.4151: Develop a repair/replace policy $342 $60 $630
12,013
kWh
- - $(-288.0)
11 2.4221: Install compressor air intakes in coolest locations $301 $135 $301
5,749
kWh
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $246 - $246
4,759
kWh
- - -
13 2.2628: Utilize a less expensive cooling method $224 $120 $224
4,269
kWh
- - -
14 3.4116: Meter recycled water (to reduce sewer charges) $3,365 $96 - - $3,365
-
Tgal
-
TOTAL RECOMMENDED $41,085 $15,643 $4,962
94,902
kWh
$33,182
-
MMBtu
$3,365
-
Tgal
$(-424.0)
TOTAL IMPLEMENTED $28,805 $8,272 $3,048
58,381
kWh
$22,816
-
MMBtu
$3,365
-
Tgal
$(-424.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs