ITAC Assessment: MI0310
ITAC logo
ITAC Assessment: MI0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 94,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,917 3,041,204
kWh
Electricity Demand $84,184 8,036
kW-mo/yr
Electricity Fees $50,109 -
TOTAL YEARLY COSTS $281,209
RECOMMENDED SAVINGS* $151,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.2628: Utilize a less expensive cooling method $66,228 $330,000 $40,567
845,152
kWh
$24,011
-
kW-mo/yr
- $1,650
02 2.6218: Turn off equipment when not in use $26,938 $3,600 $26,938
561,210
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,634 $87,759 $7,588
158,087
kWh
$8,046
-
kW-mo/yr
- -
04 2.7221: Lower temperature during the winter season and vice-versa $14,676 $640 $9,137
190,350
kWh
$5,539
-
kW-mo/yr
- -
05 2.8114: Change rate schedules or other changes in utility service $9,210 $2,400 - - $9,210 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,522 $1,660 $2,417
50,361
kWh
$3,105
-
kW-mo/yr
- -
07 2.3132: Recharge batteries on during off-peak demand periods $3,771 $3,140 - $3,771
-
kW-mo/yr
- -
08 2.8123: Pay utility bills on time $2,996 - - - $2,996 -
09 2.7293: Install dry sprinkler system or other method to reduce heating requirements $1,743 $1,756 $1,093
22,778
kWh
$650
-
kW-mo/yr
- -
10 2.7135: Install occupancy sensors $1,537 $5,036 $1,537
32,033
kWh
- - -
11 2.4221: Install compressor air intakes in coolest locations $1,321 $1,310 $829
17,271
kWh
$492
-
kW-mo/yr
- -
12 2.4323: Use optimum size and capacity equipment $1,128 $2,500 $227
4,736
kWh
$901
-
kW-mo/yr
- -
13 2.4239: Eliminate or reduce compressed air usage $1,107 $1,700 $478
9,952
kWh
$629
-
kW-mo/yr
- -
TOTAL RECOMMENDED $151,811 $441,501 $90,811
1,891,930
kWh
$47,145
-
kW-mo/yr
$12,206 $1,650
TOTAL IMPLEMENTED $65,814 $100,315 $38,036
792,436
kWh
$15,572
-
kW-mo/yr
$12,206 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings