Assessment Year | 2005 |
---|---|
Principal Product | Press Wood Pallets |
NAICS | 321920: Wood Container and Pallet Manufacturing |
SIC | 2448: Wood Pallets and Skids |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
35,000
ft2
|
Annual Production | 40,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $350,087 | 5,536,500 |
kWh
|
$0.063 |
Electricity Fees | $6,678 | - |
|
- |
Natural Gas | $375,885 | 70,043 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,081 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $11,798 | $10,700 | - | $11,798 | - | - | |
02 | 2.2511: Insulate bare equipment | $7,542 | $6,594 | - | - |
$7,542
-
MMBtu
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,407 | $900 |
$5,407
83,919
kWh
|
- | - | - | |
04 | 2.4151: Develop a repair/replace policy | $2,674 | $135 |
$2,794
43,364
kWh
|
- | - | $(-120.0) | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,788 | - | - | $1,788 | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,567 | - |
$1,567
24,373
kWh
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $1,475 | $1,005 |
$(-378.0)
(-5,860)
kWh
|
- |
$1,853
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,399 | $60 |
$1,399
21,709
kWh
|
- | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,312 | $165 |
$1,492
23,275
kWh
|
- | - | $(-180.0) | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $831 | $70 |
$831
12,891
kWh
|
- | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $748 | $2,542 |
$748
11,602
kWh
|
- | - | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $396 | $140 |
$396
6,156
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $36,937 | $22,311 |
$14,256
221,429
kWh
|
$13,586 |
$9,395
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $20,081 | $10,406 |
$12,839
199,424
kWh
|
- |
$7,542
-
MMBtu
|
$(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs