Assessment Year | 1992 |
---|---|
Principal Product | CONVEYOR BELT DRYERS |
NAICS |
n/a
|
SIC | 3552: Textile Machinery |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 4,050
pieces
|
Production Hrs. Annual | 2,288
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,617 | 763,775 |
kWh
|
$0.11 |
Natural Gas | $8,491 | 1,965 |
MMBtu
|
$4.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,225 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,096 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,255 | $100 |
$6,255
-
kWh
|
- | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,424 | - |
$2,891
25,205
kWh
|
$(-467.0)
-
MMBtu
|
- | |
03 | 2.1122: Re-size charging openings or add a movable door on equipment | $1,309 | $2,000 | - |
$1,309
-
MMBtu
|
- | |
04 | 2.2531: Re-size charging openings or add movable cover or door | $730 | $2,200 | - |
$730
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $841 | $1,794 |
$841
7,327
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $55 | - |
$111
879
kWh
|
- | $(-56.0) | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $477 | $600 |
$477
3,810
kWh
|
- | - | |
08 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $134 | - |
$134
1,172
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,225 | $6,694 |
$10,709
38,393
kWh
|
$1,572
-
MMBtu
|
$(-56.0) | ||
TOTAL IMPLEMENTED | $8,096 | $2,700 |
$6,843
4,689
kWh
|
$1,309
-
MMBtu
|
$(-56.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs