Assessment Year | 2005 |
---|---|
Principal Product | Coupling of Motors and Other Equipment |
NAICS | 332919: Other Metal Valve and Pipe Fitting Manufacturing |
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
120,000
ft2
|
Annual Production | 2,600,000
pieces
|
Production Hrs. Annual | 6,656
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,166 | 3,036,717 |
kWh
|
$0.040 |
Electricity Demand | $65,945 | 6,434 |
kW-mo/yr
|
$10.25 |
Electricity Fees | $8,362 | - |
|
- |
Natural Gas | $54,104 | 6,959 |
MMBtu
|
$7.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,500 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,059 | $8,260 |
$9,810
229,935
kWh
|
$4,249
-
kW-mo/yr
|
- | - | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $6,573 | $8,352 |
$(-635.0)
(-14,896)
kWh
|
$(-550.0)
-
kW-mo/yr
|
- |
$7,758
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,268 | - |
$2,976
69,536
kWh
|
$1,292
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,968 | $11,900 |
$2,456
57,574
kWh
|
$1,512
-
kW-mo/yr
|
- | - | - | |
05 | 2.3212: Optimize plant power factor | $2,190 | $820 | - | - | $2,190 | - | - | |
06 | 2.4151: Develop a repair/replace policy | $1,229 | $304 |
$1,663
38,969
kWh
|
$718
-
kW-mo/yr
|
- | - | $(-1,152.0) | |
07 | 2.4322: Use or replace with energy efficient substitutes | $1,763 | $336 |
$1,230
28,829
kWh
|
$533
-
kW-mo/yr
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,536 | $870 |
$1,075
25,198
kWh
|
$461
-
kW-mo/yr
|
- | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $951 | $238 |
$664
15,540
kWh
|
$287
-
kW-mo/yr
|
- | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $943 | $24 |
$658
15,423
kWh
|
$285
-
kW-mo/yr
|
- | - | - | |
11 | 2.7135: Install occupancy sensors | $921 | $2,268 |
$616
14,444
kWh
|
$305
-
kW-mo/yr
|
- | - | - | |
12 | 2.7492: Use proper thickness of insulation on building envelope | $560 | $145 | - | - | - |
$560
-
MMBtu
|
- | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $539 | $132 |
$376
8,817
kWh
|
$163
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $39,500 | $33,649 |
$20,889
489,369
kWh
|
$9,255
-
kW-mo/yr
|
$2,190 |
$8,318
-
MMBtu
|
$(-1,152.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs