Assessment Year | 2005 |
---|---|
Principal Product | Aluminum beverage cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
241,200
ft2
|
Annual Production | 2,000,000,000
pieces
|
Production Hrs. Annual | 8,688
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,682,447 | 33,350,000 |
kWh
|
$0.050 |
Electricity Demand | $403,384 | 51,986 |
kW-mo/yr
|
$7.76 |
Natural Gas | $707,600 | 113,920 |
MMBtu
|
$6.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,380 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,955 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $12,800 | $27,700 |
$10,520
191,200
kWh
|
$2,280
-
kW-mo/yr
|
- | - | |
02 | 3.7132: Reuse rags until completely soiled | $12,000 | - | - | - | - | $12,000 | |
03 | 2.4314: Use synthetic lubricant | $11,335 | - |
$9,315
169,375
kWh
|
$2,020
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,110 | $2,800 |
$9,130
166,100
kWh
|
$1,980
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,975 | - |
$7,375
134,100
kWh
|
$1,600
-
kW-mo/yr
|
- | - | |
06 | 2.3212: Optimize plant power factor | $2,270 | $5,600 | - |
$2,270
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,380 | $1,080 |
$380
6,900
kWh
|
$80
-
kW-mo/yr
|
- | $1,920 | |
08 | 2.7124: Make a practice of turning off lights when not needed | $735 | - |
$575
10,450
kWh
|
$160
-
kW-mo/yr
|
- | - | |
09 | 2.2515: Use optimum thickness insulation | $505 | $35 | - | - |
$505
-
MMBtu
|
- | |
10 | 2.2515: Use optimum thickness insulation | $270 | $40 | - | - |
$270
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $62,380 | $37,255 |
$37,295
678,125
kWh
|
$10,390
-
kW-mo/yr
|
$775
-
MMBtu
|
$13,920 | ||
TOTAL IMPLEMENTED | $56,955 | $30,500 |
$36,915
671,225
kWh
|
$8,040
-
kW-mo/yr
|
- | $12,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs