Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fiberglass Matting Reinforcement
NAICS 327993: Mineral Wool Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 10,400,000
lb
Production Hrs. Annual 8,688
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,083 3,344,299
kWh
Electricity Fees $8,204 -
Natural Gas $404,163 73,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2442: Preheat combustion air with waste heat $30,489 $20,910 - $30,489
-
MMBtu
-
02 2.2511: Insulate bare equipment $17,374 $5,922 - $17,374
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $2,768 $660 - $2,768
-
MMBtu
-
04 2.7313: Recycle air for heating, ventilation and air conditioning $2,517 $370 - $2,517
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,967 $2,040 $1,967
45,415
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $1,591 $420 $1,591
36,625
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $1,120 $520 $1,120
25,743
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $985 $160 $985
22,684
kWh
- -
09 2.4151: Develop a repair/replace policy $934 $160 $1,174
26,956
kWh
- $(-240.0)
10 2.6124: Establish equipment maintenance schedule $796 $40 $796
18,459
kWh
- -
11 2.2614: Use cooling tower or economizer to replace chiller cooling $777 $1,060 $777
17,580
kWh
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $696 $3,480 $696
16,014
kWh
- -
13 2.7135: Install occupancy sensors $395 $800 $395
9,195
kWh
- -
14 2.2628: Utilize a less expensive cooling method $318 $105 $318
7,325
kWh
- -
TOTAL RECOMMENDED $62,727 $36,647 $9,819
225,996
kWh
$53,148
-
MMBtu
$(-240.0)
TOTAL IMPLEMENTED $23,147 $12,602 $6,013
138,723
kWh
$17,374
-
MMBtu
$(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings