ITAC Assessment: WV0304
ITAC logo
ITAC Assessment: WV0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Molded Door Skins
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 86,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $487,949 20,960,000
kWh
Electricity Demand $327,614 44,488
kW-mo/yr
Natural Gas $1,066,235 120,067
MMBtu
Wood $10,800 22,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings
01 2.1331: Burn a less expensive grade of fuel $83,144 $1,360 $(-1,118.0)
(-48,052)
kWh
$(-780.0)
-
kW-mo/yr
$89,795
-
MMBtu
$(-4,753.0)
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,964 $2,752 $7,652
328,746
kWh
$3,312
-
kW-mo/yr
- -
03 2.4151: Develop a repair/replace policy $11,373 $220 $7,936
341,052
kWh
$3,437
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $5,483 $4,491 - - $4,804
-
MMBtu
$679
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,051 $210 $2,129
91,489
kWh
$922
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,679 $22 $1,869
80,332
kWh
$810
-
kW-mo/yr
- -
07 2.2625: Chill water to the highest temperature possible $1,535 $44 $1,071
45,972
kWh
$464
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,376 - $960
41,242
kWh
$416
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $1,328 $271 $928
39,721
kWh
$400
-
kW-mo/yr
- -
10 2.2511: Insulate bare equipment $509 $44 $355
15,249
kWh
$154
-
kW-mo/yr
- -
11 2.4322: Use or replace with energy efficient substitutes $418 $154 $293
12,647
kWh
$125
-
kW-mo/yr
- -
TOTAL RECOMMENDED $121,860 $9,568 $22,075
948,398
kWh
$9,260
-
kW-mo/yr
$94,599
-
MMBtu
$(-4,074.0)
-
MMBtu
TOTAL IMPLEMENTED $24,480 $7,673 $13,258
569,705
kWh
$5,739
-
kW-mo/yr
$4,804
-
MMBtu
$679
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs