ITAC Assessment: WV0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Building Wraps & MH Supplies
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 330,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,053 7,974,583
kWh
Electricity Demand $152,345 19,354
kW-mo/yr
Other Gas $196,367 23,025
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $278,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $206,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $32,334 $3,536 $24,905
491,068
kWh
$7,429
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $11,389 $648 $8,768
172,973
kWh
$2,621
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $11,230 $1,590 - - $11,230
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,992 - $4,606
90,605
kWh
$1,386
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,599 $180 $4,313
64,988
kWh
$1,286
-
kW-mo/yr
- - -
06 2.2628: Utilize a less expensive cooling method $4,689 $1,078 $3,611
71,199
kWh
$1,078
-
kW-mo/yr
- - -
07 2.4151: Develop a repair/replace policy $3,908 $180 $3,172
62,702
kWh
$952
-
kW-mo/yr
- - $(-216.0)
08 2.7492: Use proper thickness of insulation on building envelope $3,710 $1,875 - - $3,710
-
MMBtu
- -
09 2.1133: Adjust burners for efficient operation $2,636 $4,144 - - $2,636
-
MMBtu
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,047 $190 $1,581
31,188
kWh
$466
-
kW-mo/yr
- - -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,062 $1,116 $1,590
31,351
kWh
$472
-
kW-mo/yr
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,517 $3,234 $966
18,950
kWh
$551
-
kW-mo/yr
- - -
13 2.2414: Use waste heat from hot flue gases to preheat $17,097 $3,330 - - $17,097
-
MMBtu
- -
14 2.4227: Use compressor air filters $878 $9 $758
14,997
kWh
$228
-
kW-mo/yr
- - $(-108.0)
15 2.4239: Eliminate or reduce compressed air usage $632 $186 $416
8,206
kWh
$216
-
kW-mo/yr
- - -
16 2.2522: Isolate hot or cold equipment $258 $544 $200
3,950
kWh
$58
-
kW-mo/yr
- - -
17 3.5217: Reuse / recycle/ sell paper products $172,800 $360 - - - $172,800
-
lb
-
TOTAL RECOMMENDED $278,778 $22,200 $54,886
1,062,177
kWh
$16,743
-
kW-mo/yr
$34,673
-
MMBtu
$172,800
-
lb
$(-324.0)
TOTAL IMPLEMENTED $206,824 $6,103 $26,170
495,960
kWh
$8,178
-
kW-mo/yr
- $172,800
-
lb
$(-324.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs