ITAC Assessment: WV0297
ITAC logo
ITAC Assessment: WV0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Activated Carbon
NAICS 322230: Stationery Product Manufacturing
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 12,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,722 6,868,825
kWh
Natural Gas $521,550 61,275
MMBtu
Other Energy $130,837 37,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.2511: Insulate bare equipment $121,920 $33,990 - $121,920
-
MMBtu
-
02 2.1221: Replace obsolete burners with more efficient ones $25,862 $55,500 - $25,862
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $18,874 $6,254 - $18,874
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,905 $1,326 $2,905
83,212
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,307 $108 $2,307
64,848
kWh
- -
06 2.2135: Repair and eliminate steam leaks $1,262 $1,200 - - $1,262
-
MMBtu
07 2.4151: Develop a repair/replace policy $1,041 $142 $1,041
39,145
kWh
- -
08 2.2113: Repair or replace steam traps $799 $1,000 - - $799
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $793 $94 $793
22,219
kWh
- -
10 2.4221: Install compressor air intakes in coolest locations $751 $282 $751
21,120
kWh
- -
TOTAL RECOMMENDED $176,514 $99,896 $7,797
230,544
kWh
$166,656
-
MMBtu
$2,061
-
MMBtu
TOTAL IMPLEMENTED $9,107 $3,870 $7,046
209,424
kWh
- $2,061
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs