Assessment Year | 2004 |
---|---|
Principal Product | Activated Carbon |
NAICS | 322230: Stationery Product Manufacturing |
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
12,000
ft2
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $239,722 | 6,868,825 |
kWh
|
$0.035 |
Natural Gas | $521,550 | 61,275 |
MMBtu
|
$8.51 |
Other Energy | $130,837 | 37,429 |
MMBtu
|
$3.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $176,514 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,107 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $121,920 | $33,990 | - |
$121,920
-
MMBtu
|
- | |
02 | 2.1221: Replace obsolete burners with more efficient ones | $25,862 | $55,500 | - |
$25,862
-
MMBtu
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $18,874 | $6,254 | - |
$18,874
-
MMBtu
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,905 | $1,326 |
$2,905
83,212
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,307 | $108 |
$2,307
64,848
kWh
|
- | - | |
06 | 2.2135: Repair and eliminate steam leaks | $1,262 | $1,200 | - | - |
$1,262
-
MMBtu
|
|
07 | 2.4151: Develop a repair/replace policy | $1,041 | $142 |
$1,041
39,145
kWh
|
- | - | |
08 | 2.2113: Repair or replace steam traps | $799 | $1,000 | - | - |
$799
-
MMBtu
|
|
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $793 | $94 |
$793
22,219
kWh
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $751 | $282 |
$751
21,120
kWh
|
- | - | |
TOTAL RECOMMENDED | $176,514 | $99,896 |
$7,797
230,544
kWh
|
$166,656
-
MMBtu
|
$2,061
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,107 | $3,870 |
$7,046
209,424
kWh
|
- |
$2,061
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs