ITAC Assessment: WV0291
ITAC logo
ITAC Assessment: WV0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Welded Steal tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 210,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 4,368
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,692 786,486
kWh
Electricity Demand $1,323 1,563
kW-mo/yr
Natural Gas $74,106 9,249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $14,733 $360 $14,422
235,872
kWh
$311
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,255 $1,032 $9,060
148,170
kWh
$195
-
kW-mo/yr
-
03 2.4151: Develop a repair/replace policy $6,488 - $6,298
185,469
kWh
$466
-
kW-mo/yr
$(-276.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,578 $4,824 $5,401
87,307
kWh
$177
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,186 - $2,186
35,748
kWh
- -
06 2.7135: Install occupancy sensors $1,720 $1,316 $1,684
27,636
kWh
$36
-
kW-mo/yr
-
07 2.2614: Use cooling tower or economizer to replace chiller cooling $1,519 $5,205 $1,487
24,319
kWh
$32
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $1,485 $116 $1,427
22,883
kWh
$58
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $685 $747 $658
10,548
kWh
$27
-
kW-mo/yr
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $550 $100 $529
8,534
kWh
$21
-
kW-mo/yr
-
TOTAL RECOMMENDED $44,199 $13,700 $43,152
786,486
kWh
$1,323
-
kW-mo/yr
$(-276.0)
TOTAL IMPLEMENTED $29,535 $5,284 $28,836
552,930
kWh
$975
-
kW-mo/yr
$(-276.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs