Assessment Year | 2004 |
---|---|
Principal Product | Welded Steal tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 82 |
Plant Area |
210,000
ft2
|
Annual Production | 32,000,000
lb
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $215,692 | 786,486 |
kWh
|
$0.27 |
Electricity Demand | $1,323 | 1,563 |
kW-mo/yr
|
$0.85 |
Natural Gas | $74,106 | 9,249 |
MMBtu
|
$8.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,199 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,535 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $14,733 | $360 |
$14,422
235,872
kWh
|
$311
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,255 | $1,032 |
$9,060
148,170
kWh
|
$195
-
kW-mo/yr
|
- | |
03 | 2.4151: Develop a repair/replace policy | $6,488 | - |
$6,298
185,469
kWh
|
$466
-
kW-mo/yr
|
$(-276.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,578 | $4,824 |
$5,401
87,307
kWh
|
$177
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,186 | - |
$2,186
35,748
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $1,720 | $1,316 |
$1,684
27,636
kWh
|
$36
-
kW-mo/yr
|
- | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,519 | $5,205 |
$1,487
24,319
kWh
|
$32
-
kW-mo/yr
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $1,485 | $116 |
$1,427
22,883
kWh
|
$58
-
kW-mo/yr
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $685 | $747 |
$658
10,548
kWh
|
$27
-
kW-mo/yr
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $550 | $100 |
$529
8,534
kWh
|
$21
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $44,199 | $13,700 |
$43,152
786,486
kWh
|
$1,323
-
kW-mo/yr
|
$(-276.0) | ||
TOTAL IMPLEMENTED | $29,535 | $5,284 |
$28,836
552,930
kWh
|
$975
-
kW-mo/yr
|
$(-276.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs