ITAC Assessment: WV0284
ITAC logo
ITAC Assessment: WV0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Cement products
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 38,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,897 1,249,800
kWh
Electricity Demand $66,079 4,354
kW-mo/yr
Electricity Fees $7,861 -
Natural Gas $47,356 4,945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,441

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,486 $300 $2,088
58,165
kWh
$2,398
-
kW-mo/yr
-
02 2.7241: Install outside air damper / economizer on hvac unit $3,869 $1,800 $2,381
66,511
kWh
$1,488
-
kW-mo/yr
-
03 2.4151: Develop a repair/replace policy $3,396 $250 $2,137
59,772
kWh
$2,459
-
kW-mo/yr
$(-1,200.0)
04 2.7144: Install spectral reflectors / delamp $1,065 $2,666 $336
9,386
kWh
$729
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $938 - $440
12,058
kWh
$498
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $880 $625 $409
11,427
kWh
$471
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $880 $1,200 $409
11,485
kWh
$471
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $741 $900 $346
9,668
kWh
$395
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $660 $605 $307
8,574
kWh
$353
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,915 $8,346 $8,853
247,046
kWh
$9,262
-
kW-mo/yr
$(-1,200.0)
TOTAL IMPLEMENTED $10,441 $2,650 $5,420
151,148
kWh
$6,221
-
kW-mo/yr
$(-1,200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs