| Assessment Year | 2008 |
|---|---|
| Principal Product | Fan Clutch for Class 8 Trucks |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 160 |
| Plant Area |
120,000
ft2
|
| Annual Production | 250,000
pieces
|
| Production Hrs. Annual | 5,980
hrs
|
| Location (State) | South Dakota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $197,738 | 4,968,000 |
kWh
|
$0.040 |
| Electricity Demand | $5,354 | 1,071 |
kW-mo/yr
|
$5.00 |
| Electricity Fees | $10,903 | - |
|
- |
| LPG | $142,654 | 5,811 |
MMBtu
|
$24.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $108,947 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,034 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $52,036 | - | - | - | - |
$52,036
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,622 | $459 |
$3,689
92,693
kWh
|
$933
-
kW-mo/yr
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,886 | $832 |
$1,495
37,589
kWh
|
$391
-
kW-mo/yr
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,195 | $54 |
$955
24,006
kWh
|
$240
-
kW-mo/yr
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $13,871 | $1,700 | - | - | - |
$13,871
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,324 | $37,346 |
$16,232
407,836
kWh
|
$4,092
-
kW-mo/yr
|
- | - | |
| 07 | 2.7241: Install outside air damper / economizer on hvac unit | $3,364 | $4,000 |
$3,364
84,529
kWh
|
- | - | - | |
| 08 | 2.7224: Reduce space conditioning during non-working hours | $587 | $142 | - | - |
$587
-
MMBtu
|
- | |
| 09 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $7,158 | $4,624 | - | - | - |
$7,158
-
MMBtu
|
|
| 10 | 2.2511: Insulate bare equipment | $524 | $254 |
$524
13,176
kWh
|
- | - | - | |
| 11 | 2.6122: Adjust vents to minimize energy use | $3,380 | $294 | - | - | - |
$3,380
-
MMBtu
|
|
| TOTAL RECOMMENDED | $108,947 | $49,705 |
$26,259
659,829
kWh
|
$5,656
-
kW-mo/yr
|
$587
-
MMBtu
|
$76,445
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,034 | $5,781 |
$9,503
238,817
kWh
|
$1,564
-
kW-mo/yr
|
$587
-
MMBtu
|
$3,380
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | |||