| Assessment Year | 2003 |
|---|---|
| Principal Product | Hydraulic rods and cylinders |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
225,000
ft2
|
| Annual Production | 30,000
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $301,335 | 10,761,360 |
kWh
|
$0.028 |
| Electricity Demand | $187,175 | 22,231 |
kW-mo/yr
|
$8.42 |
| Electricity Fees | $(-12,009.0) | - |
|
- |
| Natural Gas | $111,233 | 17,529 |
MMBtu
|
$6.35 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,214 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,523 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,616 | - |
$4,476
165,788
kWh
|
$2,140
-
kW-mo/yr
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,533 | - |
$3,065
113,977
kWh
|
$1,468
-
kW-mo/yr
|
- | - | |
| 03 | 2.4151: Develop a repair/replace policy | $6,214 | $625 |
$4,606
171,405
kWh
|
$2,208
-
kW-mo/yr
|
- | $(-600.0) | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $5,034 | $250 |
$3,403
126,547
kWh
|
$1,631
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,121 | $150 |
$1,434
53,338
kWh
|
$687
-
kW-mo/yr
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $7,108 | $1,418 |
$5,043
187,520
kWh
|
$2,065
-
kW-mo/yr
|
- | - | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $3,894 | $500 |
$2,640
98,280
kWh
|
$1,254
-
kW-mo/yr
|
- | - | |
| 08 | 2.2437: Recover waste heat from equipment | $5,379 | $810 | - | - |
$5,379
-
MMBtu
|
- | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,937 | $250 |
$1,986
73,697
kWh
|
$951
-
kW-mo/yr
|
- | - | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $1,296 | $735 |
$876
32,604
kWh
|
$420
-
kW-mo/yr
|
- | - | |
| 11 | 2.7135: Install occupancy sensors | $2,244 | $1,450 |
$1,592
59,199
kWh
|
$652
-
kW-mo/yr
|
- | - | |
| 12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,750 | $4,590 |
$1,672
62,181
kWh
|
$1,078
-
kW-mo/yr
|
- | - | |
| 13 | 2.2437: Recover waste heat from equipment | $1,088 | $2,000 |
$(-284.0)
(-10,548)
kWh
|
- |
$1,372
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $51,214 | $12,778 |
$30,509
1,133,988
kWh
|
$14,554
-
kW-mo/yr
|
$6,751
-
MMBtu
|
$(-600.0) | ||
| TOTAL IMPLEMENTED | $34,523 | $8,483 |
$23,874
887,105
kWh
|
$11,249
-
kW-mo/yr
|
- | $(-600.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs