ITAC Assessment: WV0237
ITAC logo
ITAC Assessment: WV0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Commercial Boats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area 80,000
ft2
Annual Production 5,408
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,068 4,194,714
kWh
Natural Gas $100,630 14,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,782

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,306 $1,855 $1,306
41,035
kWh
- - - -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $946 $118 $1,087
20,803
kWh
- - $(-141.0) -
03 2.7111: Reduce illumination to minimum necessary levels $2,490 $470 $2,490
47,499
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,170 $324 $1,170
22,268
kWh
- - - -
05 2.2437: Recover waste heat from equipment $2,375 $174 - $2,375
-
MMBtu
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,506 $47 $1,506
28,714
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,358 $100 $1,358
25,784
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,569 $242 $1,569
29,694
kWh
- - - -
09 2.2414: Use waste heat from hot flue gases to preheat $892 $1,898 - $892
-
MMBtu
- - -
10 2.7261: Install timers and/or thermostats $10,991 $297 - $10,991
-
MMBtu
- - -
11 2.2614: Use cooling tower or economizer to replace chiller cooling $2,336 $2,223 $2,336
44,536
kWh
- - - -
12 3.5316: Contract a wood pallet recycling company $15,600 $100 - - $15,600
-
lb
- -
13 3.5248: Separate and recycle scrap metal to foundry or for sale $2,700 $300 - - $2,700
-
lb
- -
14 3.5316: Contract a wood pallet recycling company $14,316 $500 - - $14,316
-
lb
- -
15 4.425: Eliminate/reduce redundant inspections $11,731 $3,228 - - - - $11,731
16 4.652: Replace existing equipment with more suitable substitutes $15,000 $2,505 - - - - $15,000
TOTAL RECOMMENDED $86,286 $14,381 $12,822
260,333
kWh
$14,258
-
MMBtu
$32,616
-
lb
$(-141.0) $26,731
TOTAL IMPLEMENTED $52,782 $4,029 $9,316
193,529
kWh
$10,991
-
MMBtu
$32,616
-
lb
$(-141.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs