Assessment Year | 2002 |
---|---|
Principal Product | Commercial Boats |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $100 M to 500M |
# of Employees | 165 |
Plant Area |
80,000
ft2
|
Annual Production | 5,408
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,068 | 4,194,714 |
kWh
|
$0.052 |
Natural Gas | $100,630 | 14,999 |
MMBtu
|
$6.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,286 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,782 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,306 | $1,855 |
$1,306
41,035
kWh
|
- | - | - | - | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $946 | $118 |
$1,087
20,803
kWh
|
- | - | $(-141.0) | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,490 | $470 |
$2,490
47,499
kWh
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,170 | $324 |
$1,170
22,268
kWh
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $2,375 | $174 | - |
$2,375
-
MMBtu
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,506 | $47 |
$1,506
28,714
kWh
|
- | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,358 | $100 |
$1,358
25,784
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,569 | $242 |
$1,569
29,694
kWh
|
- | - | - | - | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $892 | $1,898 | - |
$892
-
MMBtu
|
- | - | - | |
10 | 2.7261: Install timers and/or thermostats | $10,991 | $297 | - |
$10,991
-
MMBtu
|
- | - | - | |
11 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,336 | $2,223 |
$2,336
44,536
kWh
|
- | - | - | - | |
12 | 3.5316: Contract a wood pallet recycling company | $15,600 | $100 | - | - |
$15,600
-
lb
|
- | - | |
13 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $2,700 | $300 | - | - |
$2,700
-
lb
|
- | - | |
14 | 3.5316: Contract a wood pallet recycling company | $14,316 | $500 | - | - |
$14,316
-
lb
|
- | - | |
15 | 4.425: Eliminate/reduce redundant inspections | $11,731 | $3,228 | - | - | - | - | $11,731 | |
16 | 4.652: Replace existing equipment with more suitable substitutes | $15,000 | $2,505 | - | - | - | - | $15,000 | |
TOTAL RECOMMENDED | $86,286 | $14,381 |
$12,822
260,333
kWh
|
$14,258
-
MMBtu
|
$32,616
-
lb
|
$(-141.0) | $26,731 | ||
TOTAL IMPLEMENTED | $52,782 | $4,029 |
$9,316
193,529
kWh
|
$10,991
-
MMBtu
|
$32,616
-
lb
|
$(-141.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs